Hosed

Work has been insane this week. Since Friday, really. In:Sane.

I took a minute to check on the Lake Asshole Bucket. It was maybe 15% full. I put the wet vac’s hose into the bucket and sucked all of that shit right up. Bucket:Empty. That worked much better than trying to get the blender out from under the pipe without spilling anything (which was impossible).

The dehumidifier is still cranking away. I had to empty it once. The floor is pretty much dry. Oh happy day.

Two weeks (approximately) until they come to replace the water heater. Two weeks of Lake Asshole monitoring.

Now I will have time to have dinner with the love of my life, watch What If with the love of my life and possibly with my step son (via a watch party), and then add lead guitars to the four songs that are currently ready for them. The finished 50/90 song count is currently sitting at 38. Four more are ready for leads, six are ready for vocals (car music in the morning?), and two barely exist.

Hopefully going to make a push over the next couple of days… assuming work lets me. Have I mentioned work has been insane this week? In:Sane.

Published by

robertjames1971

I'm wicked tall.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s