Tentative Cellar Schedule

Jen talked to the contractor today. He gave us a tentative schedule for the next couple of phases of the cellar reclamation project.

Monday will be one final day of drywall finish work. Tuesday will be a day off to let whatever happens on Monday finish drying and what have you. Painting will start on Wednesday and end on Friday. Once the painting is done the flooring will start immediate. Probably also on Friday.

No estimate on how long the flooring will take, or how long the finishing work that comes after it will take.

The hardest part for those of us who aren’t doing actual work is to just remain patient. It’s really difficult. Jen and I both want this done. We’re both tired of stressing out over everything. We’re both more than ready to start putting everything back together again.

Still… painting and flooring this week. Kick ass.

Noisy Delayed Gratification

It’s almost 7:00pm. Dinner is almost cooked. We will watch the new Marvel show (maybe?).

While we do that we will be wishing we could go down stairs to see the progress. We can’t though because the two wall board guys asked if they could keep working until 9/9:30 tonight. The hammering and drilling and sawing is really loud, and so is the music they are playing, but it’s okay, stay as long as you need.

Even though we both really want to go down there and check it all out.

Progress!

Oops

I wonder if our new friend the handyman will be interested in fixing the clothes dryer that I just broke.

I had to move the washer and dryer away from the wall for the wallboard guy. That required disconnecting stuff.

I was barely pulling on the dryer’s exhaust hose and it just ripped in two.

Oops.

Shit.

Today is Insane

I’m stressing out, bro.

There are so many people here. A three man electrician team, our regular contractor, his drywall subcontractor, and a landscaper team with at least four people. Talk about a perfect storm. We knew the electricians and our regular contractor would be here. Everyone else is a surprise.

The old cellar lights with the big fluorescent tubes are gone. The last of the drop ceiling framing is gone, the last of the un-insulated cellar walls have been insulated. The front and back yards have been cleaned, including the litter that the wind and the squirrels put into the edge of the woods. Most of it at least. They didn’t do the best job there, but they did a good job everywhere else.

As we speak, the new cellar lighting is being installed and wired up, and the wall board that is going to be installed starting tomorrow is being loaded into the cellar.

From a Covid safety standpoint, everyone is masked and everyone is entering the house through the cellar bulkhead. The cellar is a big open space so everyone can stay as distanced as they need, and no one has to walk through the main floor to get in and out.

Still… It’s stressful. It’s also loud. Lots of banging and hammering and crashing and cacophony and super loud leaf blowers and all of that stuff. It’s making it difficult to work.

Oh yeah, speaking of work. Insert frustrated screaming here. Nothing too terrible, but lots and lots of little things that are piling up and making me want to hide my head under the covers.

So yeah… stressful as hell kinda Tuesday. I’m ready for bed.