Noisy Delayed Gratification

It’s almost 7:00pm. Dinner is almost cooked. We will watch the new Marvel show (maybe?).

While we do that we will be wishing we could go down stairs to see the progress. We can’t though because the two wall board guys asked if they could keep working until 9/9:30 tonight. The hammering and drilling and sawing is really loud, and so is the music they are playing, but it’s okay, stay as long as you need.

Even though we both really want to go down there and check it all out.

Progress!

More Changes Coming Today

Are you sick of hearing about our home improvement odyssey? Would it bore you to hear that the drywall guy is coming today to start walling up our cellar? Drywall->paint->flooring->finishing->furniture. That’s the to do list as it stands now. I’m sure you’re sick of hearing it.

Are you also sick of hearing that I am watching Marvel movies? I bet you’re all really sick of that one. Fed up, indeed. Turns out The Incredible Hulk is on HBO Max. I’m sneaking in the first 20 minutes before I have to sign in to work. Bore-ing, am I right?

At least I am not boring you all with guitar playing posts, right? You’ve got that going for you. I haven’t played at all since March 19th. That was 18 days ago. I need to play.

Okay. Time to punch in to work. Here’s hoping the stress level goes down a notch today. Fingers eternally crossed.

Hectic Weekends

Last weekend was a kitchen furniture building pre-fab marathon that left me sore and exhausted and with some sweet new looks in the kitchen and dining room.

Yesterday didn’t involve putting together pre-fab stuff but it did include moving a lot of really heavy stuff, some of which went outside for a junk pickup service to haul away. The living room doesn’t look terribly different, but the changes we made make it feel completely new. It’s weird that way.

Now what? Well… now comes the biggest job of all. The cellar. We have someone coming this week to replace the lights, then someone coming to take down what’s left of the panelling on the walls and replace it all with wall board, including a new paint job. After that we’re getting new flooring installed.

Then what? Furniture, mostly. Nothing is set in stone yet, but we’re thinking a mini-living room space and maybe a pull out couch or something that can act as a guest room. Like everything else we do, the more time we have before it happens the more complex the plans get. We’re thinking of maybe upgrading a few things in the living room (not the TV, our TV is gigantic and amazing and it’s staying right where it is) and moving the current things to the cellar.

Jen came up with this plan, and it’s a good one that I wish I thought of, to have a space in the cellar where I can go to ride out my post-surgical recovery period. I could stew in the living room all day, but she’d be working in the next room and I’d be afraid I was bothering her. If we have an alternate living room space in the cellar I could go there and moan and groan in my post-op agony without worrying about being heard on her conference calls. I imagine the first few days are going to be spent in the bed room, but as things (hopefully) lighten up for me I will probably go into the cellar and maybe binge watch all of the Marvel movies or something. Assuming we stay on schedule and everything is done by May 4th.

As for this moment in time… holy shit does my back hurt.

Cellar Reclamation Project Phase 1a

Three additions to the cellar reclamation project.  Uncle Jimmy’s comfy chair has been moved to the television area, along with a lot of old stuff moved out of the way.  Also, Jen’s iMac has been put onto a little (temporary) desk behind the sectional.  Finally, the awesome Bruins banner that my gorgeous wife got me after the 2011 Stanley Cup Championship has finally, finally been hung on the wall.  

 

Cellar Reclamation Project Phase 1a

Cellar Reclamation Project Phase 1a