Early Morning

The wallboard folks asked if they could come early this morning. 7:30 or so. We were up and ready to go before 7:00.

Jen is trying to figure out why the Roomba stops working before it finishes. I just put a big tarp over the washer and the dryer before the sanding starts today. I’m also trying to sneak in Iron Man 2. I started watching it last night but didn’t get far.

The weekend is so close I can almost smell it. It’s been a tough week. I need a break. Jen and I are both getting to the point where we are feeling the remodeling fatigue. The construction blues. Whatever you want to call it. We just want it to be over. We still have a couple of weeks to go though. They are going to start taping and mudding and sanding the drywall today (are those the correct terms?). It will likely carry over to the beginning of next week. Then paint, then hopefully around the same time the painting wraps up the new flooring will be delivered and that can start. Once that’s done it’s on to the finishing work. Baseboards and things like that. Then we bring in some furniture. Maybe a nice rug. Homey the place up, you know? Then I move my desk downstairs, and then we take a nice long break from construction while I get my insides rewired.

Oh yeah. That. The surgery is 26 days away.

Today is Insane

I’m stressing out, bro.

There are so many people here. A three man electrician team, our regular contractor, his drywall subcontractor, and a landscaper team with at least four people. Talk about a perfect storm. We knew the electricians and our regular contractor would be here. Everyone else is a surprise.

The old cellar lights with the big fluorescent tubes are gone. The last of the drop ceiling framing is gone, the last of the un-insulated cellar walls have been insulated. The front and back yards have been cleaned, including the litter that the wind and the squirrels put into the edge of the woods. Most of it at least. They didn’t do the best job there, but they did a good job everywhere else.

As we speak, the new cellar lighting is being installed and wired up, and the wall board that is going to be installed starting tomorrow is being loaded into the cellar.

From a Covid safety standpoint, everyone is masked and everyone is entering the house through the cellar bulkhead. The cellar is a big open space so everyone can stay as distanced as they need, and no one has to walk through the main floor to get in and out.

Still… It’s stressful. It’s also loud. Lots of banging and hammering and crashing and cacophony and super loud leaf blowers and all of that stuff. It’s making it difficult to work.

Oh yeah, speaking of work. Insert frustrated screaming here. Nothing too terrible, but lots and lots of little things that are piling up and making me want to hide my head under the covers.

So yeah… stressful as hell kinda Tuesday. I’m ready for bed.